TM 1-1520-238-23
11-338
11.76.
CPG CYCLIC STICK LOCK RELEASE WIRE ROPE REMOVAL/INSTALLATION continued
11.76.4. Cleaning
a. Wipe removed and attaching parts with a
clean rag.
11.76.5. Inspection
a. Check wire rope for fraying. None allowed.
b. Check removed and attaching parts for
cracks. None allowed.
c. Check removed and attaching parts for dam-
age (para 11.5).
d. Check removed and attaching parts for corro-
sion (para 1.49).
11.76.6. Installation
a. Install wire rope (1) in support (5) on cyclic
stick (4).
b. Install wire rope (1) on lever lock release re-
tainer (2).
(1) Slide lever (2) on end of wire rope (1).
(2) Install new cotter pin (3).
c. Inspect (QA).
END OF TASK
M04-1692-3
1
3
2
5
4