TM 1-1520-238-23
11-344
11.78.
CPG CYCLIC STICK BASE ASSEMBLY REMOVAL/INSTALLATION continued
11.78.5. Inspection
a. Check removed and attaching parts for
cracks. None allowed.
b. Check removed and attaching parts for dam-
age (para 11.5).
c. Check removed and attaching parts for corro-
sion (para 1.49).
d. Check all installed bushing(s) and/or bear-
ing(s) for wear (para 11.5).
e. Check all removed bushing(s) and/or bear-
ing(s) for wear (para 11.4).
11.78.6. Installation
a. Install indicator (13) on base (2). Torque screw
(14) to 5 INCH-POUNDS.
(1) Aline indicator (13) with base (2).
(2) Install screw (14) through washer (15) and
base (2).
(3) Torque screw (14) to 5 INCH-POUNDS. Use
torque wrench.
b. Install base (2) on lock (8). Torque nut (10) 45 to
85 INCH-POUNDS.
(1) Aline base (2) with lock (8).
(2) Install bolt (12) through lock (8) and base (2).
(3) Install washer (11) and nut (10).
(4) Torque nut (10) to 45 INCH-POUNDS. Use
torque wrench.
(5) Increase torque to aline cotter pin hole, but do
not exceed 85 INCH-POUNDS.
(6) Install new cotter pin (9).
GO TO NEXT PAGE
9
10
11
M04-5069-4
2
12
13
15
14
8
