TM 1-1520-238-23
11-656
11.148. CPG DIRECTIONAL SHEAR PIN ACTIVATED DECOUPLER (SPAD) ASSEMBLY
DISASSEMBLY/ASSEMBLY (AVIM) continued
11.148.6. Assembly
NOTE
Detent will be secured and adjusted
when SPAD switch is installed.
a. Install detent (30) on arm (16).
(1) Aline detent (30) with arm (16).
(2) Install two screws (33) through washers (34),
detent (30), and arm (16).
(3) Install two washers (32) and nuts (31) on
screws (33).
b. Install rig connecting link (23) on arm (16).
(1) Aline link (23) with arm (16).
(2) Install bolt (27) through washer (28), bushing
(29), and arm (16).
(3) Install bushing (26) and nut (25) on bolt (27).
(4) Install shear rivet (11.147).
(5) Install new cotter pin (24).
c. Install arm (2) on arm (16).
(1) Aline arm (2) with arm (16).
(2) Install bolt (20) through washer (21), bushing
(22), arm (2), and arm (16).
(3) Install washer (19) and nut (18) on bolt (20).
(4) Install new cotter pin (17).
GO TO NEXT PAGE
M04-4311-5
33
34
30
32
31
16
M04-4311-6
26
25
27
28
29
23
16
24
M04-4311-7
22
20
21
19
18
17
16
2
