TM 1-1520-238-23
Change 3
11-759
11.172. PILOT LONGITUDINAL SHEAR PIN ACTIVATED DECOUPLER (SPAD)
REMOVAL/INSTALLATION continued
i. Detach connector (A334)P1 (16) from recep-
tacle J271 (17).
j. Remove longitudinal F.S. 130 push-pull rod
(18) from SPAD (19).
(1) Remove cotter pin (20).
(2) Remove nut (21).
(3) Remove bolt (22), washer (23), bushing (24),
and rod (18) from SPAD (19).
k. Remove longitudinal F.S. 137 push-pull rod
(25) from SPAD (19).
(1) Remove and discard cotter pin (26).
(2) Remove nut (27).
(3) Remove bolt (28), washer (29), bushing (30),
and rod (25) from SPAD (19).
GO TO NEXT PAGE
M04-1742-3
17
16
22
23
24
18
21
20
M04-1742-4
19
M04-1742-5
29
30
19
28
25
26
27