TM 1-1520-238-23
11-880
11.201.
CPG LONGITUDINAL CONTROL POSITION LINEAR VARIABLE DIFFERENTIAL TRANSDUCER
(LVDT) INSTALLATION continued
d. Install LVDT (2) on bracket (13). Torque nut (14)
14 to 18 INCH-POUNDS.
(1) Aline LVDT (2) with bracket (13).
(2) Install bolt (15) through washer (16), bracket
(13), and LVDT (2).
(3) Check fit of self-retaining bolt (15) (para
11.1).
(4) Install nut (14). Torque nut (14) to 14 INCH-
POUNDS. Use torque wrench.
(5) Increase torque to aline cotter pin hole, but do
not exceed 18 INCH-POUNDS.
(6) Install new cotter pin (17).
e. Install CPG cyclic stick -9 rig pin (para 11.285).
f. Attach connector P236 (8) to receptacle J236
(18).
g. Install two clamps (19) on wire harness (9).
(1) Install screw (20) through washer (21), clamp
(19), and spacer (22).
(2) Install screw (20) through washer (21), clamp
(19), and nut (23).
GO TO NEXT PAGE
M04-1856-3
15
16
2
13
14
17
M04-1856-4
VIEW LOOKING UP AND AFT
20
19
21
23
20
21
19
22
18
8
9