TM 1-1520-238-23
12-111
12.35.
PILOT FIRE BOTTLE SELECT SWITCH REPLACEMENT - continued
12.35.6. Installation
a. Enter CPG station (para 1.56). Observe all
safety precautions.
b. Attach wires (8) to new switch (6).
(1) Position identified wires (8) on terminals (9).
(2) Install screws (10), washers (11), and termi-
nal lugs (12).
c. Install switch (6) on panel (2).
(1) Install lockwasher (7) on switch (6).
(2) Install switch (6) through panel (2).
d. Enter pilot station (para 1.56). Observe all
safety precautions.
e. Install lockring (5) and nut (4) on switch (6).
f. Install panel (1) on panel (2).
(1) Position panel (1) on panel (2).
(2) Install two screws (3).
g. Inspect (QA).
h. Perform fire extinguishers maintenance op-
erational check (TM 1-1520-238-T).
i. Install nontransparent barrier (para 2.178).
END OF TASK
M04-988-5
2
7
6
8
9
11
10
12
TORQUE
120
M04-988-6
4
5
6
RES
BTL
FIRE
TORQUE
PRI
120
2
3
1
M04-988-7