TM 1-1520-238-23
12-324
12.77.
CANOPY SEVERANCE DEVICE REMOVAL/INSTALLATION - continued
g. Install cord (9) on airframe (10).
(1) Install clamp (13) on cord (9).
(2) Install screw (11) through washer (12) and
clamp (13) on airframe (10).
NOTE
Step h will not be necessary for aircraft
equipped with one piece detonation cord.
h. Install cord (5) on union (6). Torque nut (7) to
80 INCH-POUNDS.
(1) Install new packing (8) on nut (7).
(2) Install nut (7) on union (6).
(3) Hold union (6). Torque nut (7) to 80 INCH-
POUNDS. Use torque wrench.
(4) Lockwire nut (7) to union (6). Use wire
(item 224, App F).
i. Install cord (1) on block (2). Torque nut (3) to
80 INCH-POUNDS.
(1) Install new packing (4) on nut (3).
(2) Install nut (3) on block (2).
(3) Hold block (2). Torque nut (3) to 80 INCH-
POUNDS. Use torque wrench.
(4) Lockwire nut (3) to block (2). Use wire
(item 224, App F).
j. Inspect (QA).
k. Install optical relay tube (if required)
(TM 1-1270-476-20).
l. Install pilot and/or CPG FIRE CONTROL panel
(if required) (TM 9-1230-476-20-1).
END OF TASK
11
12
9
10
13
M04-3054-14
5
M04-3054-15
6
8
7
2
4
1
3
M04-3054-16
