TM 1-1520-238-23
12-328
12.78.
CANOPY SEVERANCE INITIATOR HANDLE REMOVAL/INSTALLATION - continued
c. Check removed and attaching parts for corro-
sion (para 1.49).
WARNING
Detonation cords are explosive. Do
not move canopy initiator handles or
remove safety pins. Detonation may
cause injury to personnel. If injury oc-
curs, seek medical aid.
12.78.6. Installation
a. Install initiator handle (1) in pilot or CPG sta-
tion. Torque nut (3) to 125 INCH-POUNDS.
(1) Install initiator handle (1) through grommet
(7).
(2) Install nut (2) and washer (5) on initiator han-
dle (1). Use open end wrench.
(3) Install initiator handle (1) through bracket (6)
until washer (5) contacts bracket (6).
(4) Install washer (4) and nut (3) on initiator han-
dle (1).
(5) Position initiator handle (1) so that interfer-
ence will not exist with pilot or CPG FIRE
CONTROL panel.
(6) Torque nut (3) to 125 INCH-POUNDS. Use
crowfoot and torque wrench.
(7) Lockwire nut (2) to bracket (6). Use wire
(item 223, App F).
GO TO NEXT PAGE
3
4
6
52
1
7
CPG
STATION
M04-3353-8
PILOT
STATION
