TM 1-1520-238-23
E-7
E.6.
REMOVAL FROM FLYABLE STORAGE NO TIME LIMIT
This task covers:
Removal from Storage.
E.6.1. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
Light duty laboratory apron (item 27, App H)
Chemical protective gloves (item 154, App H)
Adjustable air filtering respirator (item 262, App H)
Materials/Parts:
Cloth (item 52, App F)
Dry cleaning solvent (item 74, App F)
Personnel Required:
67R
Attack Helicopter Repairer
67R3F
Attack Helicopter Repairer/Technical
Inspector
152FG
Maintenance Test Pilot
References:
TM 1-1500-204-23
TM 1-1500-328-23
TM 1-1520-238-PMS
TM 55-1500-344-23
TM 55-1520-238-10
TM 55-2840-248-23
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
NOTE
Refer to TM 1-1500-204-23 for general procedures for removing aircraft from storage.
E.6.2. Removal from Storage
a. Remove mooring tiedowns from helicopter.
b. Remove main rotor blade tiedowns (para 1.107).
c. Remove all barrier material and tape.
(1) Remove all barrier material, tape and residue left by tape. Use cloth (item 52, App F) and dry cleaning
solvent (item 74, App F).
d. Remove protective covers (para 1.60).
e. Install external stores jettison firing cartridges (para 16.3).
GO TO NEXT PAGE