TM 1-1520-238-23
4-504
4.151.
COLLECTIVE SERVOCYLINDER ENGINE CONTROL ROD REMOVAL/INSTALLATION continued
c. Inspect (QA).
d. Perform load demand spindle rigging check (para 4.184).
e. Perform power plants maintenance operational check (engine 1 and engine 2) (TM 1-1520-238-T).
f. Secure access panel L200 (para 2.2).
END OF TASK