TM 1-1520-238-23
4-540
Change 1
4.161.
NO. 2 ENGINE POWER AVAILABLE SPINDLE CABLE INSTALLATION (PILOT TO
CPG) continued
n. Install clamp (32) on bracket (33).
(1) Install clamp (32) on cable (2).
(2) Aline clamp (32) with bracket (33).
(3) Install screw (34) through washer (35), clamp
(32), spacer (36), and bracket (33).
(4) Install washer (37) and nut (38) on screw
(34).
o. Inspect (QA).
p. Perform No. 2 engine power available spindle
system rigging check (para 4.187).
q. Install gun turret assembly, area weapon, flex-
ible chute, and aerial rocket control
(TM 9-1090-208-23-1).
r. Install console panels PL1, PL3, PL5, CL1, and
CL3 (para 2.2).
END OF TASK
M04-1194-17
2
3435
32
36
33
37
38