TM 1-1520-238-23
4-560
4.166.
PILOT POWER QUADRANT REMOVAL/INSTALLATION continued
e. Install rod end (6) on No. 2 power lever (7).
Torque nut (10) 14 to 18 INCH-POUNDS.
(1) Install bolt (9) through power lever (7) and rod
end (6).
(2) Install nut (10) on bolt (9)..
(3) Hold bolt (9). Torque nut (10) to 14 INCH-
POUNDS. Use torque wrench and crowfoot.
(4) Increase torque to aline cotter pin hole, but do
not exceed 18 INCH-POUNDS.
(5) Install new cotter pin (8).
f. Inspect (QA).
g. Perform power plants maintenance operation-
al
check
(engine
1
and
engine
2)
(TM 1-1520-238-T).
h. Install panels PL1 and PL3 (para 2.2).
END OF TASK
9
10
8
6
7
M04-1195-11