TM 1-1520-238-23
4-656
Change 1
4.183.
NO. 2 ENGINE POWER AVAILABLE SPINDLE (PAS) RIGGING PROCEDURE continued
m. Remove rig pin (20) from LDS gearbox (21).
(1) Remove lockwire and rig pin (20).
n. Remove cap screw (22) from gearbox (18).
(1) Remove lockwire from cap screw (22).
(2) Remove cap screw (22).
o. Install rig pin (20) in PAS gearbox rig pin hole
(23).
NOTE
Rig pin must bottom and lock gearbox
pinion in position. If rig pin bottoms and
locks, go to step v. If rig pin does not
bottom and lock, go to step p.
p. In pilot station, remove rig pin (8) from bracket
(9) and bellcranks (10) and (11).
q. Position bellcrank (10), to remove cable rod
end (24).
(1) Remove and discard cotter pin (25).
(2) Hold bolt (26). Remove nut (27).
(3) Remove bolt (26) from bellcrank (10) and rod
end (24).
r. Move cable (28) as required until rig pin (20)
can be installed in rig pin hole (23).
NOTE
Pin must bottom and lock gearbox pinion
in position.
GO TO NEXT PAGE
M04-1208-7
18
22
21
20
M04-1208-9
20
23
11
M04-1208-60
10
8
9
M04-1208-10
11
25
27
24
28
26