NO. 2 ENGINE POWER AVAILABLE SPINDLE (PAS) RIGGING PROCEDURE continued
s. Install 3 rig pin (8) fully in bracket (9) and
bellcranks (10) and (11).
t. Adjust cable (28).
(1) If rod end (24) requires forward movement,
hold cable flats (29). Loosen nut (30). Tighten
nut (31) to aline rod end (24) with bellcrank
(11).
(2) If rod end (24) requires aft movement, hold
cable flats (29). Loosen nut (31). Tighten nut
(30) to aline rod end (24) to bellcrank (11).
(3) Hold cable flats (29). Torque nuts (30) and
(31) to 90 INCH-POUNDS. Use torque
wrench and crowfoot.