TM 1-1520-238-23
Change 1
4-653
4.183.
NO. 2 ENGINE POWER AVAILABLE SPINDLE (PAS) RIGGING PROCEDURE continued
b. At pilot power quadrant (1), set two stop
screws (2) completely in for maximum No. 2
power lever (3) travel.
c. Enter CPG station (para 1.56). Observe all
safety precautions.
d. At CPG power quadrant (4), set two stop
screws (5) completely in for maximum No. 2
power lever (6) travel.
e. Set pilot No. 2 power lever (3) and No. 1 power
lever (7) to IDLE.
GO TO NEXT PAGE
M04-1208-29A
3
2
2
1
CPG STATION
M04-1208-2A
4
6
M04-1208-41
5
5
M04-1208-8A
7
3