TM 1-1520-238-23
4-664
Change 1
4.183.
NO. 2 ENGINE POWER AVAILABLE SPINDLE (PAS) RIGGING PROCEDURE continued
aq. Adjust cable (42).
(1) If rod end (38) requires forward movement,
hold cable flats (43). Loosen nut (44). Tighten
nut (45) to aline rod end (38) with power lever
(6).
(2) If rod end (38) requires aft movement, hold
cable flats (43). Loosen nut (45). Tighten nut
(44) to aline rod end (38) with power lever (6).
(3) Hold cable flats (43). Torque nuts (44) and
(45) to 90 INCH-POUNDS. Use torque
wrench and crowfoot.
ar. Install rod end (38) on power lever (6). Torque
nut (41) 14 TO 18 INCH-POUNDS.
(1) Position rod end (38) in power lever (6).
(2) Install bolt (40) through power lever (6) and
rod end (38).
(3) Check fit of selfretaining bolt (para 11.1)
(4) Hold bolt (40). Install nut (41). Torque nut (41)
to 14 INCH-POUNDS. Use torque wrench.
(5) Increase torque to aline cotter pin hole, but do
not exceed 18 INCH-POUNDS.
(6) Install new cotter pin (39).
GO TO NEXT PAGE
M04-1208-53
38
6
42
M04-1208-22A
42
43
45
44
M04-1208-23A
40
38
39
6
41