TM 1-1520-238-23
Change 1
4-665
4.183.
NO. 2 ENGINE POWER AVAILABLE SPINDLE (PAS) RIGGING PROCEDURE continued
as. In pilot station, remove rig pin (8) from bracket
(9) and bellcranks (10) and (11).
at. Move power lever (3) to OFF, IDLE, FLY, LOCK-
OUT, and back to IDLE position.
au. When power lever (3) is moved, verify power
lever (6) moves to OFF, IDLE, FLY, LOCKOUT,
and back to IDLE position.
NOTE
If rig pin was removed in step as, proceed
to step aw.
av. In pilot station, remove rig pin (8) from bracket
(9) and bellcranks (10) and (11).
aw. Inspect (QA).
ax. Install CPG FUEL panel (para 10.62).
ay. Install CPG INTR LT panel (para 9.81).
az. Install pilot FUEL panel (para 10.54).
ba. Install pilot EXT LT/INTR LT panel (para 9.62).
bb. Perform power plants maintenance operation-
al check (engine 2) (TM 1-1520-238-T).
bc. Install No. 2 engine shroud assembly (para
4.103).
bd. Install console panels PL1, PL3, CL1, and CL3
(para 2.2).
END OF TASK