TM 1-1520-238-23
8-59
8.22.
PILOT/CPG ENGINE INSTRUMENT DIM/TEST CONTROL PANEL
REMOVAL/INSTALLATION continued
d. Remove DIM/TEST control panel (1) from in-
strument panel (2).
(1) Remove two screws (3).
(2) Pull panel (1) from panel (2).
(3) Detach connector P787 (pilot)/P1092 (CPG)
(4) from receptacle (A114)J1 (pilot)/(A517)J1
(CPG) (5).
8.22.4. Cleaning
a. Wipe mounting areas and control panel with a
clean rag.
8.22.5. Inspection
a. Check DIM/TEST control panel and instru-
ment panel mounting areas for cracks, nicks,
and dents. None allowed.
b. Check instrument panel nutplates for stripped
or damaged threads. Acceptable thread dam-
age cannot exceed 50 percent of one thread.
8.22.6. Installation
a. Install panel (1) in panel (2).
(1) Attach connector P787 (pilot)/P1092 (CPG)
(4) to receptacle (A114)J1 (pilot)/(A517)J1
(CPG) (5).
(2) Aline panel (1) and panel (2) screw holes.
(3) Install two screws (3).
b. Inspect (QA).
c. Perform engine instruments maintenance op-
erational check (TM 1-1520-238-T).
END OF TASK
4
5
1
3
M04-161-4
2
4
5
3
M04-161-6
M04-161-5
2
3
1