TM 1-1520-238-23
9-34
9.9.
ELECTRICAL POWER DISTRIBUTION BOX COVER REMOVAL/INSTALLATION
9.9.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
9.9.2. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
Electrical tool kit (item 378, App H)
L-style socket head key set (item 187, App H)
Personnel Required:
67R
Attack Helicopter Repairer
68X
Armament/Electrical System Repairer
67R3F
Attack Helicopter Repairer/Technical
Inspector
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
2.161
Pilot seat tilted forward
9.9.3. Removal
a. Enter pilot station (para 1.56). Observe all
safety precautions.
b. Detach six connectors from power distribu-
tion panel (1).
(1) Detach connector P1 (2) from receptacle
(A402)J1 (3).
(2) Detach connector P2 (4) from receptacle
(A402)J2 (5).
(3) Detach connector P3 (6) from receptacle
(A402)J3 (7).
(4) Detach connector P4 (8) from receptacle
(A402)J4 (9).
(5) Detach connector P5 (10) from receptacle
(A402)J29 (11). Use socket head key set.
(6) Detach connector P461 (12) from receptacle
(A402)J32 (13).
GO TO NEXT PAGE
M04-3327-1
10
1
9
8
13
12
11
7
6
5
4
3
2
M04-3327-2
