TM 1-1520-238-23
9-38
9.9.
ELECTRICAL POWER DISTRIBUTION BOX COVER REMOVAL/INSTALLATION continued
h. Install two clamps (31) on pilot bulkhead (32).
(1) Aline two clamps (31) with pilot bulkhead
(32).
(2) Install two screws (29) and washers (30)
through clamps (31).
i. Attach six connectors to power distribution
panel (1).
(1) Attach connector P461 (12) to receptacle
(A402)J32 (13).
(2) Attach connector P5 (10) to receptacle
(A402)J29 (11).
(3) Attach connector P4 (8) to receptacle
(A402)J4 (9).
(4) Attach connector P3 (6) to receptacle
(A402)J3 (7).
(5) Attach connector P2 (4) to receptacle
(A402)J2 (5).
(6) Attach connector P1 to (2) receptacle
(A402)J1 (3).
j. Inspect (QA).
k. Return seat to upright position (para 2.161).
END OF TASK
PILOT C/B PANEL
M04-3327-13
29
30
32
29
30
31
31
1
8
12
M04-3327-11
10
11
9
7
6
5
4
3
13
2