TM 1-1520-238-23
9-55
9.16.
GENERATOR CONTROL UNIT (GCU) CIRCUIT CARD INSTALLATION (AVIM)
9.16.1. Description
This task covers:
Installation.
9.16.2. Initial Setup
Tools:
Electronic tool kit (item 379, App H)
Personnel Required:
39B
ATE Operator/Maintainer
68X
Armament/Electrical System Repairer
68X3F
Armament/Electrical System Repairer/
Technical Inspector
References:
TM 11-6625-3085-30
9.16.3. Installation
a. Install circuit cards A1 (1) and A2 (2) on gener-
ator control unit (3).
(1) Position four insulators (4) on two receptacles
J2 (5) and J3 (6).
(2) Attach circuit card A2 (2) to receptacles J2 (5)
and J3 (6).
(3) Attach circuit card A1 (1) to circuit card A2 (2).
GO TO NEXT PAGE
5
6
4
2
1
M04-1416-1
3