TM 1-1520-238-23
9-67
9.18.
GENERATOR CONTACTOR RELAY NO. 1 OR NO. 2 REMOVAL/INSTALLATION continued
9.18.6. Installation
a. Install relay (5) in box (2).
(1) Install four screws (28) through washers (29)
and relay (5) in box (2).
b. Perform
electrical
bond
check
(TM 55-1500-323-24).
(1) Bond shall be 0.0025 OHM or less. Use
ohmmeter.
c. Attach wires (22) to terminal studs A3, B3, and
C3 (23).
(1) Install identified terminal lugs (27), three flat
washers (26), lockwashers (25), and nuts
(24) on terminal studs (23).
d. Attach wires (16) to terminal studs A1, B1, and
C1 (17).
(1) Install identified terminal lugs (21), three flat
washers (20), lockwashers (19), and nuts
(18) on terminal studs (17).
e. Install shield (15) in relay (5).
f. Attach wires (9) to terminal studs A2, B2, and
C2 (10).
(1) Install identified terminal lugs (14), three flat
washers (13), lockwashers (12), and nuts
(11) on terminal studs (10).
GO TO NEXT PAGE
29
M04-1103-9
28
2
5
23
22
5
16
17
21
27
25
26
20
19
18
24
M04-1103-10
15
5
9
10
14 13 12 11
M04-1103-11
