TM 1-1520-238-23
9-68
9.18.
GENERATOR CONTACTOR RELAY NO. 1 OR NO. 2 REMOVAL/INSTALLATION continued
g. Install upper terminal shield (7) on relay (5).
(1) Tighten two captive screws (8).
h. Attach connector P5 (4) to No. 1 relay (5) or
connector P11 (4) to No. 2 relay (5).
(1) Attach connector P5 (4) to receptacle (K1)J1
(6) or connector P11 (4) to receptacle (K2)J1
(6).
i. Inspect (QA).
j. Install panel (1) on box (2).
(1) Position panel (1) on box (2).
(2) Lock seven quarter turn fasteners (3).
k. Install electrical power distribution box cover
(para 9.9).
l. Perform AC power generation maintenance
operational check (TM 1-1520-238-T).
END OF TASK
M04-1103-12
5
7
8
7
M04-1103-13
4
6
5
M04-1103-15
2
3
1