TM 1-1520-238-23
9-323
9.88.
CPG INTR LT PANEL FLOOD SWITCH REPLACEMENT (AVIM) continued
9.88.3. Removal
a. Detach wires (1) from switch S1 (2).
(1) Identify wires (1).
(2) Removal three screws (3), lockwashers (4),
and terminal lugs (5).
b. Remove switch (2) from CPG INTR LT panel
(6).
(1) Remove nut (7) and lockwasher (8).
(2) Remove switch (2) and lockring (9) from pan-
el (6).
(3) Discard switch (2).
9.88.4. Cleaning
a. Clean removed and attaching parts (para
1.47).
9.88.5. Inspection
a. Check removed and attaching parts for dam-
age (para 9.61).
b. Check wires and terminals for wear, cracks,
and cuts (para 9.61).
c. Check removed and attaching parts for corro-
sion (para 1.49).
GO TO NEXT PAGE
M04-1253-2
2
1
5
4
3
M04-1253-3
8
VIEW
ROTATED
7
2
9
6