TM 1-1520-238-23
9-328
9.90.
CPG INTR LT PANEL INST, R CSL, OR L CSL ATTENUATOR REPLACEMENT (AVIM)
9.90.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
9.90.2. Initial Setup
Tools:
Electrical tool kit (item 378, App H)
Light duty laboratory apron (item 27, App H)
Chemical protective gloves (item 154, App H)
Adjustable air filtering respirator (item 262, App H)
25-watt electric soldering iron (item 332, App H)
Materials/Parts:
Solder (item 189, App F)
Personnel Required:
68X
Armament/Electrical System Repairer
68X3F
Armament/Electrical System Repairer/
Technical Inspector
References:
TM 55-1500-323-24
Equipment Conditions:
Ref
Condition
9.83
CPG INTR LT panel light indicating panel
removed
NOTE
This task is typical for CPG INTR LT pan-
el INST, R CSL, or L CSL attenuators.
GO TO NEXT PAGE
M04-1254-1