TM 1-1520-238-23
9-325
9.89.
CPG INTR LT PANEL RELAY K1 AND SOCKET XK1 REPLACEMENT (AVIM)
9.89.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
9.89.2. Initial Setup
Tools:
Electrical tool kit (item 378, App H)
Light duty laboratory apron (item 27, App H)
Chemical protective gloves (item 154, App H)
Adjustable air filtering respirator (item 262, App H)
5-watt electric soldering iron (item 333, App H)
Materials/Parts:
Solder (item 189, App F)
Personnel Required:
68X
Armament/Electrical System Repairer
68X3F
Armament/Electrical System Repairer/
Technical Inspector
References:
TM 55-1500-323-24
9.89.3. Removal
a. Remove circuit card assembly A1 (1) from
three tube assemblies (2).
(1) Remove three screws (3), lockwashers (4),
and washers (5).
(2) Remove card (1).
GO TO NEXT PAGE
M04-5082-1
2
1
5
4
3
4
3
M04-5082-2
2
5