TM 1-1520-238-23
10-583
10.137. AUXILIARY FUEL TANK KIT (TWO TANK) INSTALLATION continued
NOTE
Do not tighten elbow jam nuts. Elbow
may need to be positioned during tube
installations.
i. Install elbows (26) and (27) on inboard pylon
(2).
(1) Lubricate threads of elbow (26). Use
antiseize compound (item 29, App F).
(2) Place elbow (26) in inboard opening (28).
(3) Hold elbow (26). Install washer (29) and jam
nut (30).
(4) Lubricate threads of elbow (27). Use
antiseize compound (item 29, App F).
(5) Place elbow (27) with washer (31) in out-
board opening (32).
(6) Hold elbow (27). Install washer (31) and jam
nut (33).
GO TO NEXT PAGE
M04-3484-6
27
26
2
28
29
30
31
33
32