TM 1-1520-238-23
10-616
10.141.
AUXILIARY FUEL TANK KIT (FOUR TANK) INSTALLATION continued
s. Install tube (55).
(1) Lubricate threads of union (35). Use antiseize
compound (item 29, App F).
(2) Hold union (35). Install nut (56).
t. Secure union (35) on right wing.
(1) Hold union (35). Tighten jam nut (34).
u. Secure tubes (41), (48), and (55).
(1) Position two clamps (63) on tube (41).
(2) Position two clamps (64) on tube (48).
(3) Position four clamps (65) on tube (55) oppo-
site clamps (63) and (64).
(4) Install four screws (66) and washers (67)
through clamps (63), (64), and clamps (65).
(5) Hold screws (66). Install four nuts (68).
GO TO NEXT PAGE
M04-3486-16
RIGHT SIDE
OUTBOARD
PYLON
56
35
55
34
67
66
65
66
67
65
M04-3486-17
63
68
55
41
67
65
64
66
48
55
68
LEFT SIDE
SHOWN
M04-3486-18
41