TM 1-1520-238-23
11-154
Change 2
11.29.
COLLECTIVE STICK STORES JETTISON SWITCH REPLACEMENT
11.29.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
11.29.2. Initial Setup
Tools:
Electrical tool kit (item 378, App H)
Light duty laboratory apron (item 27, App H)
Heat protective gloves (item 155, App H)
Adjustable air filtering respirator (item 262, App H)
5-watt electric soldering iron (item 333, App H)
Materials/Parts:
Adhesive (item 14, App F)
Solder (item 189, App F)
Personnel Required:
68X
Armament/Electrical System Repairer
68X3F
Armament/Electrical System Repairer/
Technical Inspector
References:
TM 1-1520-238-T
TM 55-1500-323-24
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
11.24
Collective stick grip assembly removed
NOTE
This task is typical for pilot or CPG collec-
tive stick.
11.29.3. Removal
a. Remove knobs (1) and (2).
(1) Loosen setscrews (3) and (4).
(2) Remove knobs (1) and (2).
b. Remove indicator panel (5) from collective
grip (6).
(1) Remove three screws (7).
(2) Remove panel (5).
GO TO NEXT PAGE
M04-3514-1A
2
1
5
6
7
3
4