TM 1-1520-238-23
11-332
11.74.
CPG CYCLIC STICK WIRE ROPE RELEASE FITTING REMOVAL/INSTALLATION
11.74.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
11.74.2. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
Materials/Parts:
Cotter pin (2)
Personnel Required:
67R
Attack Helicopter Repairer
67R3F
Attack Helicopter Repairer/Technical
Inspector
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
GO TO NEXT PAGE
CPG STATION
M04-1688-1
M04-1688-2