TM 1-1520-238-23
11-360
Change 4
11.83.
CPG CYCLIC STICK HOUSING LATERAL SHEAR PIN REPLACEMENT
11.83.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
11.83.2. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
Light duty laboratory apron (item 27, App H)
Industrial faceshield (item 129, App H)
Chemical protective gloves (item 154, App H)
10 - 50 inch-pound 1/4-inch drive click type torque
wrench (item 434, App H)
Materials/Parts:
Cotter pin (2)
Petrolatum (item 138, App F)
Wire (item 220, App F)
Personnel Required:
67R
Attack Helicopter Repairer
67R3F
Attack Helicopter Repairer/Technical
Inspector
References:
TM 1-1520-238-T
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
2.2
Access door B60 removed
11.65
CPG cyclic stick cover removed
WARNING
Installation of a solid steel shear pin in
a BUCS-equipped aircraft will render
the BUCS system inoperative. Installa-
tion of a frangible type shear pin in an
aircraft not equipped with BUCS may
result in loss of flight controls and
possible loss of aircraft.
11.83.3. Removal
a. Enter CPG station (para 1.56). Observe all
safety precautions.
GO TO NEXT PAGE
M04-1699-11
SOLID STEEL
FOR USE ON NON - BUCS AIRCRAFT ONLY
FRANGIBLE TITANIUM
FOR USE ON BUCS AIRCRAFT ONLY
CPG
STATION
M04-1699-1