TM 1-1520-238-2311-646Change 111.146.CPG DIRECTIONAL SHEAR PIN ACTIVATED DECOUPLER (SPAD) SHEAR PINREPLACEMENT – continued11.146.3. Removala. Remove directional push-pull rod (1) from arm(2).(1) Remove and discard cotter pin (3).(2) Remove nut (4).(3) Remove bolt (5), washer (6), and bushing (7).NOTEIf a shear pin(s) cannot be removed byconventional means, after repeated at-tempts from any of the SPAD assemblies(CPG or pilot), deliberately shearing thepin is permitted. Ensure the ends of thepins are removed.b. Remove shear pin retainer (8) from arm (2).(1) Remove lockwire.(2) Remove retainer (8).NOTEShear pin must be removed in pieces ifsheared.c. Remove shear pin half (9) from arm (2).d. Remove shear pin half (10) from SPAD (11).(1) Move arm (2) for access to shear pin half(10).(2) Remove shear pin half (10).11.146.4. Cleaninga. Wipe removed and attaching parts with aclean rag.11.146.5. Inspectiona. Check removed and attaching parts for dam-age (para 11.5).GO TO NEXT PAGE167243M04-1806-25M04-1806-31110982
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business