TM 1-1520-238-23
11-643
11.145. CPG DIRECTIONAL SHEAR PIN ACTIVATED DECOUPLER (SPAD) INSTALLATION continued
d. Install position transducer (23) on SPAD (1).
Torque nut (24) 30 to 40 INCH-POUNDS.
(1) Install bushing (25) in SPAD (1).
(2) Install bolt (26) through washer (27), bushing
(25), SPAD (1), and transducer (23).
(3) Check fit of self-retaining bolt (26) (para
11.1).
(4) Install nut (24). Torque nut (24) to 30 INCH-
POUNDS. Use torque wrench.
(5) Increase torque to aline cotter pin hole, but do
not exceed 40 INCH-POUNDS.
(6) Install new cotter pin (28).
e. Install directional push-pull rod (29) on SPAD
(1). Torque nut (30) 30 to 40 INCH-POUNDS.
(1) Install bushing (31) in SPAD (1).
(2) Install bolt (32) through washer (33), bushing
(31), SPAD (1), and rod (29).
(3) Check fit of self-retaining bolt (32) (para
11.1).
(4) Install nut (30). Torque nut (30) to 30 INCH-
POUNDS. Use torque wrench.
(5) Increase torque to aline cotter pin hole, but do
not exceed 40 INCH-POUNDS.
(6) Install new cotter pin (34).
GO TO NEXT PAGE
M04-1805-6
26
27
25
28
24
1
23
M04-1805-7
33
30
32
1
31
29
34