TM 1-1520-238-2311-64211.145. CPG DIRECTIONAL SHEAR PIN ACTIVATED DECOUPLER (SPAD) INSTALLATION – continuedCAUTIONTo prevent damage to flight control sys-tem components, do not use force toaline push-pull rod with SPAD.b. Install directional push-pull rod (10) on SPAD(1). Torque nut (11) 30 to 40 INCH-POUNDS.(1) Install bushings (12) and (13) in SPAD (1).(2) Install bolt (14) through washer (15), bushing(13), SPAD (1), bushing (12), and rod (10).(3) Check fit of self-retaining bolt (14) (para11.1).(4) Install nut (11). Torque nut (11) to30 INCH-POUNDS. Use torque wrench.(5) Increase torque to aline cotter pin hole, but donot exceed 40 INCH-POUNDS.(6) Install new cotter pin (16).c. Install directional push-pull rod (17) on SPAD(1). Torque nut (18) 30 to 40 INCH-POUNDS.(1) Install bushing (19) in SPAD (1).(2) Install bolt (20) through washer (21), bushing(19), SPAD (1), and rod (17).(3) Check fit of self-retaining bolt (20) (para11.1).(4) Install nut (18). Torque nut (18) to 30 INCH-POUNDS. Use torque wrench.(5) Increase torque to aline cotter pin hole, but donot exceed 40 INCH-POUNDS.(6) Install new cotter pin (22).GO TO NEXT PAGE10141512M04-1805-411613112021119M04-1805-5171822
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business