TM 1-1520-238-23
11-742
11.168.
DIRECTIONAL F.S. 159.98 PUSH-PULL ROD ASSEMBLY REMOVAL/INSTALLATION continued
11.168.3. Removal
a. Remove push-pull rod assembly (1) from bell-
crank (2).
(1) Remove and discard cotter pin (3).
(2) Remove nut (4).
(3) Remove bolt (5), washer (6), and bushing (7).
(4) Remove rod (1).
b. Remove rod (1) from bellcrank (8).
(1) Remove and discard cotter pin (9).
(2) Remove nut (10).
(3) Remove bolt (11), washer (12), and bushing
(13).
(4) Remove rod (1).
11.168.4. Cleaning
a. Wipe removed and attaching parts with a
clean rag.
11.168.5. Inspection
a. Check removed and attaching parts for dam-
age (para 11.5).
b. Check removed and attaching parts for corro-
sion (para 1.49).
c. Check all installed bushing(s) and/or bear-
ing(s) for wear (para 11.5).
d. Check all removed bushing(s) and/or bear-
ing(s) for wear (para 11.4).
GO TO NEXT PAGE
M04-4371-2
4
3
1
5
6
7
2
M04-4371-3
8
11
12
10
13
9
1