TM 1-1520-238-23
Change 8
16-25
16.5.
PYLON RACK DISASSEMBLY/ASSEMBLY (AVIM)
16.5.1. Description
This task covers:
Disassembly. Cleaning. Inspection. Repair. Assembly.
16.5.2. Initial Setup
Tools:
Electrical tool kit (item 378, App H)
Light duty laboratory apron (item 27, App H)
Chemical protective gloves (item 154, App H)
5X & 12X monocular magnifier (item 206, App H)
10-ton hydraulic hand operated arbor press (item 236,
App H)
Adjustable air filtering respirator (item 262, App H)
30 - 150 inch-pound 1/4-inch drive click type torque
wrench (item 435, App H)
0 - 600 inch-pound 3/8-inch drive dial indicator torque
wrench (item 447, App H)
Materials/Parts:
Cotter pin (8)
Spring pin (4)
Corrosion preventive compound (item 63, App F)
Dry cleaning solvent (item 74, App F)
Epoxy primer coating kit (item 78, App F)
Grease (item 86, App F)
Personnel Required:
68X
Armament/Electrical System Repairer
68X3F
Armament/Electrical System Repairer/
Technical Inspector
References:
TM 1-1500-204-23
TM 55-1500-345-23
16.5.3. Disassembly
NOTE
Ensure pylon rack is set to HOOK UN-
LOCKED.
a. Remove HOOK LOCKED/HOOK UNLOCKED
indicator (1).
(1) Remove screw (2), washer (3), and indicator
(1) (two places).
NOTE
The pylon rack halves are matched set of
mounting brackets and must be main-
tained and or replaced as such.
GO TO NEXT PAGE
3
1
2
M04-2704-43
