TM 1-1520-238-23
Change 2
11-98.1/(11-98.2 blank)
11.14.
MAIN ROTOR PITCH LINK REMOVAL/INSTALLATION continued
c. Inspect (QA).
d. Perform flight control system maintenance operational check (TM 1-1520-238-T).
e. Perform main rotor track and balance maintenance operational check (TM 1-1520-238-T).
END OF TASK