TM 1-1520-238-23
11-143
11.26.
COLLECTIVE STICK STABILATOR MANUAL SWITCH REMOVAL/INSTALLATION
11.26.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
11.26.2. Initial Setup
Tools:
Electrical tool kit (item 378, App H)
Light duty laboratory apron (item 27, App H)
Heat protective gloves (item 155, App H)
Adjustable air filtering respirator (item 262, App H)
5-watt electric soldering iron (item 333, App H)
Materials/Parts:
Solder (item 189, App F)
Personnel Required:
68X
Armament/Electrical System Repairer
68X3F
Armament/Electrical System Repairer/
Technical Inspector
References:
TM 1-1520-238-T
TM 55-1500-323-24
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
11.24
Collective stick grip assembly removed
NOTE
This task is typical for CPG or pilot station
switch assembly. CPG switch assembly
shown.
11.26.3. Removal
a. Enter pilot/CPG station (para 1.56). Observe
all safety precautions.
b. Remove switch chassis (1) from collective
stick (2).
(1) Install screwdriver through holes (3) and (4)
in chassis (1).
(2) Remove two screws (5) and washers (6).
(3) Remove chassis (1).
GO TO NEXT PAGE
CPG STATION
M04-2190-1
M04-2190-2
1
4
6
2
5
3
6
