TM 1-1520-238-23
11-216
11.44.
COLLECTIVE STICK COVER REMOVAL/INSTALLATION continued
b. On pilot center circuit breaker panel, open
ASE AC, DC, and BUCS circuit breakers.
c. In pilot station, detach receptacle J230 (1)
from connector P230 (2).
d. In CPG station, detach receptacle J234 (1)
from connector P234 (2).
e. Remove collective stick cover (3).
(1) Remove six screws (4) and washers (5) from
pilot cover (3).
(2) Remove five screws (4) and washers (5) from
CPG cover (3).
(3) Remove grommet (6) and LVDT cable (7)
from cover (3).
(4) In pilot station, detach potentiometer cable
connector P1121 (8) from NR droop compen-
sator receptacle (A656)J1 (9).
(5) Remove cover (3).
11.44.4. Cleaning
a. Wipe removed and attaching parts with a
clean rag.
11.44.5. Inspection
a. Check removed and attaching parts for dam-
age. None allowed.
b. Check removed and attaching parts for corro-
sion (para 1.49).
GO TO NEXT PAGE
2
1
PILOT STATION
M04-2960-2
8
9
5
4
3
7
6
CPG STATION
M04-2960-4
5
3
2
1
7
6
4