TM 1-1520-238-23
11-371
11.84.
CPG CYCLIC STICK HOUSING ASSEMBLY DISASSEMBLY/ASSEMBLY (AVIM) continued
d. Install yoke (16) on housing (4).
(1) Aline yoke (16) on housing (4).
(2) Install shaft (32) through yoke (16) and hous-
ing (4).
(3) Install bolt (31) through yoke (16).
(4) Install washer (30) and nut (29).
NOTE
Ensure shaft arm, cam valley, and lever
tip are facing same direction.
e. Install shaft (21) on yoke (16).
(1) Install shaft (21) through yoke (16), cam (28),
and lever (27).
(2) Aline cam (28) and lever (27) with holes in
shaft (21).
(3) Install two rivets (26) in cam (28) and lever
(27) (TM 1-1500-204-23).
f. Install guide (20) on shaft (21).
(1) Install pin (24) through shaft (21), guide (20),
and washer (23).
(2) Install new cotter pin (22).
g. Install guide (15) on yoke (16).
(1) Install spring (25) and guide (15) on guide
(20).
(2) Install pin (19) through yoke (16), guide (15),
and washer (18).
(3) Install new cotter pin (17).
GO TO NEXT PAGE
4
16
32
26
30
29
M04-4300-8
21
28
31
27
22
23
21
20
25
17
18
15
M04-4300-9
19
24
16