TM 1-1520-238-23
11-636
11.143.
CPG DIRECTIONAL SHEAR PIN ACTIVATED DECOUPLER (SPAD) PUSH-PULL ROD ASSEMBLY
REMOVAL/INSTALLATION continued
b. Install rod (4) on SPAD (5). Torque nut (7) 30 to
40 INCH-POUNDS.
(1) Aline rod (4) with SPAD (5).
(2) Install bolt (8) through washer (9), bushing
(10), bellcrank (5), and rod (4).
(3) Check fit of self-retaining bolt (8) (para 11.1).
(4) Install nut (7). Torque nut (7) to 30 INCH-
POUNDS. Use torque wrench.
(5) Increase torque to aline cotter pin hole, but do
not exceed 40 INCH-POUNDS.
(6) Install new cotter pin (6).
c. Inspect (QA).
d. Perform directional flight control rigging
maintenance
operational
check
(TM 1-1520-238-T).
e. Install cover (1) on bulkhead (2).
(1) Aline cover (1) on bulkhead (2).
(2) Install two screws (3).
f. Install access door B65L; install fairing L60
(para 2.2).
g. Inspect (QA).
h. Install
TADS/PNVS
assembly
(TM 9-1270-476-30).
i. Install flex chute, turret, and area weapon
(TM 9-1090-208-23).
END OF TASK
5
M04-4308-8
9
10
4
6
7
8
1
3
M04-4308-9
2