TM 1-1520-238-23
Change 1
4-649
4.182.
NO. 1 ENGINE POWER AVAILABLE SPINDLE (PAS) RIGGING PROCEDURE continued
aq. Remove cable rod end (38) from power lever
(6).
(1) Remove and discard cotter pin (39).
(2) Hold bolt (40). Remove nut (41).
(3) Remove bolt (40) from power lever (6) and
rod end (38).
ar. Adjust cable (42).
(1) If rod end (38) requires forward movement,
hold cable flats (43). Loosen nut (44). Tighten
nut (45) to aline rod end (38) with power lever
(6).
(2) If rod end (38) requires aft movement, hold
cable flats (43). Loosen nut (45). Tighten nut
(44) to aline rod end (38) with power lever (6).
(3) Hold cable flats (43). Torque nuts (44) and
(45) to 90 INCH-POUNDS. Use torque
wrench and crowfoot.
as. Install rod end (38) on power lever (6). Torque
nut (41) 14 to 18 INCH-POUNDS.
(1) Position rod end (38) in power lever (6).
(2) Install bolt (40) through power lever (6) and
rod end (38).
(3) Hold bolt (40). Install nut (41).Torque nut (41)
to 14 INCH-POUNDS. Use torque wrench.
(4) Increase torque to aline cotter pin hole, but do
not exceed 18 INCH-POUNDS.
(5) Install new cotter pin (39).
GO TO NEXT PAGE
M04-1207-19
6
40
38
39
41
M04-1207-21
42
44
45
43
M04-1207-22
6
40
38
39
41