TM 1-1520-238-23
4-650
Change 1
4.182.
NO. 1 ENGINE POWER AVAILABLE SPINDLE (PAS) RIGGING PROCEDURE continued
at. In pilot station, remove rig pin (8) from bracket
(9) and bellcranks (10) and (11).
au. Move power lever (3) to OFF, IDLE, FLY, LOCK-
OUT, and back to IDLE position.
av. When power lever (3) is moved, verify power
lever (6) moves to OFF, IDLE, FLY, LOCKOUT,
and back to IDLE position.
NOTE
If rig pin was removed in step at, go to
step ax.
aw. In pilot station, remove rig pin (8) from bracket
(9) and bellcranks (10) and (11).
ax. Inspect (QA).
ay. Install CPG FUEL panel (para 10.62).
az. Install CPG INTR LT panel (para 9.81).
ba. Install pilot FUEL panel (para 10.54).
bb. Install pilot EXT LT/INTR LT panel (para 9.62).
bc. Perform power plants maintenance operation-
al check (engine 1) (TM 1-1520-238-T).
bd. Install No. 1 engine shroud assembly (para
4.103).
be. Install console panels CL1, CL3, PL1, and PL3
(para 2.2).
END OF TASK
11
M04-1207-57
10
8
9
3
M04-1207-55
6
M04-1207-56
11
M04-1207-57
10
8
9