NITROGEN INERTING MONITOR PANEL REMOVAL/INSTALLATION continued
b. Attach two identified wires (6) to switch (5).
(1) Attach two terminal lugs (8) of wires (6) to
post (9) with screws (7).
c. Install panel (1).
(1) Position panel (1) for mounting.
(2) Install four screws (2) and washers (3).
d. Inspect (QA).
e. Perform nitrogen inerting system mainte-
nance operational check (TM 1-1520-238-T).
f. Secure door R295; install access panel R200
(para 2.2).
END OF TASK