TM 1-1520-238-23
16-40
Change 8
16.6.
PYLON RACK EJECTOR REMOVAL/INSTALLATION - continued
NOTE
Pylon hooks must be locked to remove
ejector.
(5) Slide ejector (1) down until ground wires (9)
and contact wires (10) can be detached.
(6) Remove screw (11) and washer (12) that at-
tach ground wires (9) and electrical lead (21)
to boss (13).
(7) Remove two screws (14) from retainer (15).
Remove contact (16) and insulator (17).
(8) Remove and discard two tie straps (18) from
ejector (1).
(9) Remove jettison wire (605) harness (20) from
rack (2).
(10) Slide ejector (1) from bottom of rack (2).
16.6.4. Cleaning
a. Wipe ejector and mounting surfaces of rack
with a clean rag.
b. Remove adhesive from contact and insulator
(para 1.47).
16.6.5. Inspection
a. Check rack for cracks ( TM 1-1520-264-23).
b. Check ejector for cracks using a magnifier
(para 16.1).
c. Check contact and insulator for damage. None
allowed.
16.6.6. Installation
a. Install contact (16) in insulator (17) until fully
seated.
b. Fill
insulator
(17)
with
adhesive
(TM 55-1500-323-24). Use adhesive (item 16,
App F).
GO TO NEXT PAGE
M04-2665-4B
16
14
15
9
10
12
11
2
13
17
1
18
20
21
0.052-
0.072
17
16
M04-2665-13A