TM 1-1520-238-23
Change 8
16-41
16.6.
PYLON RACK EJECTOR REMOVAL/INSTALLATION - continued
NOTE
(1) Adhesive should protrude 0.052 to 0.072
INCH from insulator.
c. Install ejector (1) into rack (2).
(1) Slide ejector (1) part way into rack (2) until
wires (9) and wires (10) can be attached.
(2) Place insulator (17) and contact (16) in recep-
tacle (19).
(3) Install retainer (15) on receptacle (19) using
two screws (14).
(4) Install screw (11) through washer (12) and
two wires (9) into boss (13).
(5) Install two tie straps (18) on ejector (1). Use
strap (item 193, App F).
(6) Aline bolt holes in ejector (1) and rack (2).
(7) Install three bushings (8) in holes on rack (2).
(8) Install three bolts (5) with washers (7) through
alined holes.
(9) Hold three bolts (5). Install three washers (7)
and nuts (6).
(10) Lockwire retainer (3) to bolt (4). Use wire
(item 230, App F).
d. Inspect (QA).
e. Install pylon rack (para 16.4).
f. Perform external stores jettison maintenance
operational check (TM 1-1520-238-T).
END OF TASK
M04-2665-10B
16
14
15
9
10
12
11
2
13
17
1
18
19
3
2
5
5
5
M04-2665-1 1A
7
7
4
6
6
7
8
8
M04-2665-12A
5
6
7
7
8
5
5