TM 1-1520-238-23
Change 4 8-101
8.39.
PITOT STATIC SYSTEM TUBING SPLICE REPLACEMENT
8.39.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
8.39.2. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
Light duty laboratory apron (item 27, App H)
Chemical protective gloves (item 154, App H)
Heat protective gloves (item 155, App H)
Electric gun type heater (item 163, App H)
Adjustable air filtering respirator (item 262, App H)
Materials/Parts:
Adhesive (item 9, App F)
Cloth (item 48, App F)
Cloth (item 52, App F)
Insulation sleeving (item 104, App F)
Marker (item 123, App F)
Methyl ethyl ketone (item 124, App F)
Personnel Required:
67R
Attack Helicopter Repairer
67R3F
Attack Helicopter Repairer/Technical
Inspector
References:
TM 1-1500-204-23
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
NOTE
This task is typical for all splices in pitot static system.
GO TO NEXT PAGE